案例

案例: 立式车铣磨与立车设备 process evidence

案例页要让客户看到设备曾经解决加工困难、预算压力和场地不足,而不是只看到模板文字。

案例立式车铣磨与立车设备获取立式车铣磨/立车设备报价
广东刘老板解决配件加工难题

精密零件加工厂

广东刘老板解决配件加工难题

一个圆形配件需要车削、钻孔和侧孔加工,旧工艺在多台设备之间转序,装夹误差和交期都不稳定。

WorkpieceAutomotive hub, brake drum, disc, or round precision accessory
MaterialCast iron, ductile iron, steel, or buyer drawing material
SizeTypical OD 420-650 mm; final size confirmed by drawing
Recommended modelHZ-VTM650 / HZ-VTM800 with C-axis and live-tool options
Old process routeSeparate turning, drilling, tapping, and secondary machining across several machines
问题一个圆形配件需要车削、钻孔和侧孔加工,旧工艺在多台设备之间转序,装夹误差和交期都不稳定。
New process routeVertical clamping with turning, drilling, tapping, and side-feature machining in fewer setups
结果转序减少,基准关系更稳定,重复订单排产更容易。
Evidence to confirmConfirm setup count, bore-to-face datum, bolt-circle position, cycle time, and inspection report
买设备不是为了多一台机器,而是为了解决工艺麻烦。WISEECNC 是从图纸和工序帮我们想问题。
杭州张厂长用合理预算升级能力

小批量机械加工厂

杭州张厂长用合理预算升级能力

工厂想升级加工能力,但进口设备成本太高,不能把大量现金压在设备上。

WorkpieceSmall-batch mechanical parts, disc parts, rings, hubs, or valve-type components
MaterialSteel, cast iron, stainless steel, or buyer drawing material
SizeModel selected by diameter, height, weight, travel, and tool access
Recommended modelHZ-VTM400 to HZ-VTM1000 by workpiece size and process list
Old process routeBuyer compares expensive imported equipment or several separate machines
问题工厂想升级加工能力,但进口设备成本太高,不能把大量现金压在设备上。
New process routeMatch VTM configuration to the real operations instead of overbuying unused functions
结果没有过度采购,投资压力可控,同时满足当前订单的工序覆盖。
Evidence to confirmConfirm required operations, budget range, fixture, CNC control, lead time, and acceptance standard
我们不需要最贵的设备,需要的是能解决当前零件、还能留出后续订单空间的设备。
深圳王老板用一台立式平台节省场地

紧凑型制造车间

深圳王老板用一台立式平台节省场地

厂房面积有限,如果再增加单独的车、铣、钻、磨设备,产线会拥挤,物流也更麻烦。

WorkpieceFlat, ring, flange, valve, or compact heavy workpiece in a space-limited workshop
MaterialConfirmed by drawing and production route
SizeSelected by floor space, swing diameter, table load, and unloading condition
Recommended modelSmall vertical lathe, VTM center, or gantry-type vertical compound platform
Old process routeMultiple standalone machines occupy more floor area and create more internal transfers
问题厂房面积有限,如果再增加单独的车、铣、钻、磨设备,产线会拥挤,物流也更麻烦。
New process routeConcentrate turning, milling, drilling, tapping, and optional grinding on a vertical platform
结果节省可用面积,零件搬运更简单,也不用马上扩大厂房。
Evidence to confirmConfirm machine footprint, crane or forklift access, setup reduction, and material-flow improvement
这台设备节省的不只是加工时间,还节省了空间、搬运和管理压力。